Solar panels install precautions
- Do not solar panels install in shaded places such as trees and buildings, or near open flames or flammable objects. The assembly structure should be able to adapt to the environmental requirements, please select the appropriate material and anti-corrosion treatment, and use a firm and reliable method to install the components, or the components or falling from a height will cause financial damage. The components should not be disassembled, bent or hit the components with hard objects, so as to avoid dangerous actions such as stepping on the components.
- Use spring washers and flat washers to fix and lock the panel components on the bracket. It is best to solar panels install at an angle of about 30 degrees to the sun. According to the site environment and the state of the assembly bracket structure, solar panels install in an appropriate way. Component wiring.
- The battery board assembly should be correctly connected to the positive and negative poles in the junction box, and the output circuit should be correctly connected to the device. The positive and negative poles should not be short-circuited to ensure that there is no gap between the connector and the insulating connector. If there is a gap, sparks will occur. or electrical shock.
- Always check whether the hoisting structure has fallen off. If necessary, tighten each part and check the connection status of each part, each wire, bottom wire and plug.
- Wipe the surface of the module frequently with a soft cloth. If it is necessary to replace the battery board assembly (generally it does not need to be replaced in 25 years), you should choose the same type and type of assembly, and do not touch the part of the cable connector with your hands. If it is really necessary, please use safety equipment (such as insulating gloves, etc.).
- Cover the surface of the module with an opaque object or material when servicing the module, because the module will generate high voltage under strong light, which is dangerous. The warranty period of the module is 3 years, the power attenuation of the module will not exceed 10% within 10 years, and will not exceed 20% within 20 years.
The main installation method of solar power generation system
- Tower installation
- Floor plane installation
- Pole installation
The project construction will determine the final solar panels install method according to the actual situation on the site. No matter which method is adopted, the basic requirements for solar panels install must be followed, so that the solar energy can exert the best power generation effect and ensure the normal power supply of off-grid equipment.